Summary
In addition, there were multiple challenges and key areas of site where unauthorised access was a problem and increased protection was required.
The site conditions and gradients posed challenges in maintaining the effective height of the fence whilst also avoiding any large steps and the design was produced across the site prior to commencing any works to ensure this would be achieved. This included completing a full level survey and mapping out of the site ahead of commencing works.
The planning phase of the works was particularly important to ensure there was minimal impact on the site operation. Part of the project includes the replacement of the automated access gate to site. This needed to be replaced and changed over without impacting the access route to site whilst also maintaining the secure perimeter due to anti-social behaviour.
As a standalone project we acted as principal contractor (PC) and ensured that the project was completed in line with all H&S legislation and CDM requirements.
Location
United Kingdom
Completion Year
2020
Client
Severn Trent Water