Severn Trent Water Canfen Super 10

Summary
Binns Fencing were awarded the complete security upgrade works across 3 sites on the Severn Trent estate directly with Severn Trent. This followed an extended period of engagement with the client to establish their requirements and desired outcome from the site both from a security perspective and operational through engagement with the local site teams.
These works were to be completed concurrently and required the design and replacement of the complete perimeter security solutions of the sites including:
- Complete replacement of perimeter fence line for each site
- Installation of new access gate for pedestrians and vehicles
- Clearance of vegetation where applicable
- Installation of full perimeter PID systems
- Installation of CCVT for visual verification and monitoring
- Upgrade and testing of IDS systems on site
- Integration and full testing of the complete security system back to a central alarm receiving centre.
The final specification included installation of different fencing specification and types at each of the sites based on the clients’ operational requirements. This included SR2 and SR3 rated fences with associated gate and also included the reutilisation of some materials in order to offer improved efficiency and cost savings on the project.
Location
UNITED KINGDOM
Completion Year
2020
Client
Severn Trent Water